DNV Pressure Vessels - Det Norske Veritas
We manufacture DNV pressure vessels and air receivers to DNV rules.
We source DNV approved materials, manufacture flanges, shells and dished ends from these materials and build pressure vessels with DNV certification
Please email us with your requirements or complete one of our pressure vessel enquiry forms
We also manufacture DNV air receivers,
Det Norske Veritas (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property and the environment, at sea and onshore. DNV undertakes classification, certification, and other verification and consultancy services relating to quality of ships, offshore units and installations, and onshore industries worldwide, and carries out research in relation to these functions.
DNV Offshore Codes consist of a three level hierarchy of documents:
— Offshore Service Specifications. Provide principles and procedures of
DNV classification, certification, verification and consultancy
services.
— Offshore Standards. Provide technical provisions and acceptance
criteria for general use by the offshore industry as well as
the technical basis for DNV offshore services.
— Recommended Practices. Provide proven technology and sound engineering
practice as well as guidance for the higher level
Offshore Service Specifications and Offshore Standards.
DNV Offshore Codes are offered within the following areas:
- Qualification, Quality and Safety Methodology
- Materials Technology
- Structures
- Systems
- Special Facilities
- Pipelines and Risers
- Asset Operation
INTRODUCTION
A. General
A 100 Introduction
101 This standard contains requirements for fabrication and
testing of offshore structures.
A 200 Objective
201 The objectives of this standard are to:
— provide an internationally acceptable standard to ensure
the quality of all welding operations used in offshore fabrication,
through identifying appropriate welding procedures,
welder qualifications and test methods
— serve as a technical reference document in contractual
matters between purchaser and contractor
— serve as guideline for designer, purchaser and contractor
— specify minimum requirements for welding operations
subject to DNV certification and classification.
FABRICATION AND TOLERANCES (includes pressure vessels and air
receivers)
A. General
A 100 Objective and scope
101 This section gives requirements for fabrication and tolerances
of offshore structures.
B. Fabrication Planning
B 100 General
101 As a prerequisite for fabrication, procedures, inspection
and test plans and work instructions for execution and control
of fabrication activities shall be established. The purpose of the
procedures and work instruction shall be:
— to provide instructions and information regarding the requirements
for and the principles of the work execution
— to identify and document the responsibilities and plans for
the work execution in accordance with the project requirements
— to provide information to the purchaser on how the work
is executed and controlled
— to identify applicable procedures, test plans, work instructions,
acceptance criteria, hold points and documents to be
generated
— to serve as basis for quality audits.
102 Relevant procedures, including information of pre-assembled
items and the sequence of fabricating the parts into
structure, shall be prepared.
B 200 Quality system and workmanship (includes pressure vessels and air receivers)
201 Fabrication of structural members shall have a documented
and implemented quality system according to ISO
9001 or equivalent. The extent of the quality management system
shall be dependent on the size and type of the organisation,
complexity and interaction of the processes and competence of
personnel.
202 Workmanship shall be in accordance with E following
written procedures agreed upon.
203 All work shall be skilfully and carefully executed with
adequate control by the contractor. All faults and deficiencies
shall be corrected before the material is coated with paints, cement
or similar. Repair work of significant extent shall be
demonstrated as acceptable to the purchaser.
204 Prior to commencement of the work the contractor shall
submit a plan for NDT, NDT procedures and documents for
NDT inspectors’ certification for acceptance by the purchaser.
The programme shall contain information and documents for
planning, controlling, reporting etc. Acceptance criteria for
NDT shall be accepted by the purchaser if they are not specified
in relevant documents.
C. Inspection
C 100 General
101 Inspection shall be carried out in accordance with accepted
inspection and test plans to confirm that work is carried
out in accordance with established project procedures and
plans such that all project requirements are complied with to
the satisfaction of the purchaser.
The inspection shall cover items such as:
— correct identification and documentation and use of materials
— qualification and acceptance of fabrication procedures and
personnel
— inspection of preparatory work (assembly, fit-up form
work, reinforcement etc.)
— welding inspection
— inspection of fabrication work for compliance with specifications
and procedures
— witnessing NDT, control and testing
— inspection of repairs
— inspection of corrosion protection systems
— ensure functionality of examination or testing equipment
and of recording and/or measuring devices vital for correct
functioning of equipment and machinery used in fabrication.
102 Due consideration shall be given to the access and the
time required for adequate inspection during fabrication.
103 High non-conformance rates in execution of the work or
in the product itself shall call for special considerations. Such
special considerations may include, but not be limited to, increased
inspection, re-qualification of personnel or other
agreed remedial actions.
104 Inspectors shall be qualified according to a recognised scheme and shall be able to provide documentation of proficiency.
DNV Pressure Vessels are built in our factory in Newark Other design codes and Directives details linked here include: include
Please email us with your requirements or complete one of our pressure vessel enquiry forms


Established in 1870, we have designed and built Pressure vessels for over 140 Years